检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张斌[1] ZHANG Bin
机构地区:[1]西山煤电股份有限公司马兰矿,山西太原030205
出 处:《山西焦煤科技》2018年第1期37-38,42,共3页Shanxi Coking Coal Science & Technology
摘 要:为了确保马兰矿18506工作面回采期间,南八南九运输大巷不在覆岩破坏范围内,同时也为了顶板及时垮落而不造成其他安全问题,对该矿18506综采工作面进行爆破弱化顶板的设计并进行现场试验。试验表明:初采期卸压放顶不仅可以避免由于顶板垮落步距大而影响南八南九运输大巷稳定性,而且还可以避免18506综采工作面通风困难、上隅角瓦斯浓度高、来压时出现压架与片帮等灾害,对于煤矿安全、高效、可持续开采有着十分重要的意义。In order to guarantee the safety of South 8 and South 9 transportation roadways during the mining of No.18506 working face which usually causes the instability due to the damage of overlying strata in Malan Mine,timely collapse of the mined roof are necessary to avoid other problems related to safety,roof Weakening test are conducted on the site.Tests have shown that pressure relief and roof caving in early mining period avoided the influence of large section roof collapse by distant stepping,ensured the stability of the nearby transportation roadways,other problems such as the difficulty in ventilation in the 18506 face,higher gas concentration in the upper corner of the return airv\ray,rib falling accident were also prevented.The practice is of great significance for the safe,efficient and sustainable mining in the coal mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33