检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨登[1,2,3] 尹晓辉 邹慧玲[1,2,4] 方雅瑜[1,2] 陈楠 张昊[1,2] 魏祥东 YANG Deng;YIN Xiaohui;ZOU Huiling;FANG Yayu;CEHN Nan;ZHANG Hao;WEI Xiangdong(College of Resource and Environment,Hunan Agricultural University,Changsha 410128,China;Collaborative Innovation Center of Heavy Metals Pollution Control of Southern Paddy Fields,Hunan Agricultural University,Changsha 410128,China;Guangdong Environmental Protection Engineering Research and Design Institute Co.,Ltd.,Guangzhou 510630,China;Library of Hunan Agricultural University,Changsha 410128,China)
机构地区:[1]湖南农业大学资源环境学院,湖南长沙410128 [2]湖南农业大学南方稻田重金属污染防控协同创新中心,湖南长沙410128 [3]广东省环境保护工程研究设计院有限公司,广东广州510630 [4]湖南农业大学图书馆,湖南长沙410128
出 处:《环境工程技术学报》2018年第2期155-160,共6页Journal of Environmental Engineering Technology
基 金:国家自然科学基金项目(4121511);湖南省自然科学基金项目(08JJ6018);湖南省教育厅青年基金项目(12B059);湖南省农业厅项目(2014137)
摘 要:通过野外大田试验,探讨了生物塘-人工湿地工艺去除农田灌溉水中Cd污染的效果,并进一步分析了水力停留时间对Cd净化效果的影响及净化效果的日变化规律。结果表明:试验区灌溉水中全量Cd平均浓度为13.92μg/L,是GB 5084—2005《农田灌溉水质标准》中Cd浓度限值的1.39倍,且以溶解态Cd为主,约占77.8%;经生物塘-人工湿地工艺处理后全量Cd平均去除率为42.0%,出水达标天数率为85.2%;组合工艺的Cd去除率随水力停留时间的延长呈先升高后降低趋势,最佳停留时间约为19 h;生物塘和人工湿地的Cd去除率日变化规律均呈早晚低、中午高的单峰曲线,Cd最大去除率出现在13:00左右。The cadmium removal effect in irrigation water by the combined process of biological pond and constructed wetland was investigated through a field experiment.The influence of hydraulic retention time(HRT)on the cadmium removal effect and the daily variation rules of purification effect were further analyzed.Results show that the average concentration of total cadmium in irrigation water of the experiment area is 13.92μg L,which is 1.39 times of the cadmium limit in Standards for Irrigation Water Quality(GB 5084-2005).Most of them are dissolved cadmium,accounting for 77.8%.After the treatment by the combined process,the average removal rate of total cadmium reaches 42.0%,and the effluent in 85.2%of days during experiment can reach the standard.With the extension of the HRT,the cadmium removal rate of the combined process increases at first and then decreases,and the optimal HRT found to be 19 hours.In addition,the daily variation rules of cadmium removal rate by biological pond and constructed wetland both present as a single peak curve which shows lower value in the morning and evening but higher value at noon,and meanwhile the highest efficiency appears at 13:00.
分 类 号:X522[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7