检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孟庆才 李渊毅 MENG Qingcai;LI Yuanyi(Liaoning Dongmei Capital Construction Company Limited,Shenyang110122,China)
机构地区:[1]辽宁东煤基本建设有限责任公司,辽宁沈阳110122
出 处:《建井技术》2017年第6期16-19,共4页Mine Construction Technology
摘 要:九道岭煤矿东风井净直径5.0 m,井深1 006 m。井筒施工中,采用2套单钩提升,伞形钻架打眼,中心回转式抓岩机装岩,MJY型4.0m高模板砌壁等立井施工机械化配套设备作业线和中深孔光面爆破技术,实现了安全快速施工,最高月成井达190.6 m,创东北地区煤炭行业同井型月成井最高纪录。A net diameter of the mine east ventilation shaft in Jiudaoling Mine was 5.0m and a deep depth of the shaft was 1006m During the mine shaft construction,a mine shaft construction mechanized matched equipment operation line with two sets of the single hook hoisting,the umbrellate drilling rig for the borehole drilling,central rotary clamshell for rock loading,MJY mode 4.0m high templates for lining and others and smooth blasting technology with medium and deep holes was applied A safety rapid construction was realized,a max month shaft completed rate was 190.6m and a month max records of the same size shaft was created in the coal industry of Northeast China.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.172.58