盐水水泥浆充填冻结管施工技术  

Construction Technology of Ground Freezing Pipe Backfilled with Salt-Water Cement Slurry

在线阅读下载全文

作  者:成中海 亓燕秋 王宗金 CHENG Zhonghai;QI Yanqiu;WANG Zongjin(China Coal Special Drilling Engineering Company Limited,Hefei230001,China;National Engineering Laboratory for Deep Shaft Construction Technology in Coal Mine(Huaibei),Huaibei235000,China;Anhui Provincial Research Center of Special Drilling Engineering Technology,Hefei230001,China)

机构地区:[1]中煤特殊凿井有限责任公司,安徽合肥230001 [2]煤矿深井建设技术国家工程实验室(淮北),安徽淮北235000 [3]安徽省特殊凿井工程技术研究中心,安徽合肥230001

出  处:《建井技术》2017年第6期24-27,共4页Mine Construction Technology

摘  要:鉴于当前建井速度不断加快,矿山建设方一般要求在井筒冻结工程停冻后,即对冻结管进行充填。盐水水泥浆充填冻结管技术较好地解决了普通水泥浆及含水材料在负温环境下充填冻结管时的结冰堵塞问题,实现了停冻后及时充填冻结管,既可保证施工质量,又可缩短工期,也可为井筒后续永久锁口和改绞施工提前腾出作业场地。该项技术已先后在多个冻结井筒工程中,得到了成功应用,为井筒冻结工程提供了新的作业手段,也为废弃盐水处理找到了一条新的途径,是一项绿色环保技术。该项技术对推动我国冻结法凿井技术的发展有着积极的作用。Due to the present mine shaft construction speed continually speeded up,the mine construction party generally would require to have a backfill of the ground freezing pipe as soon as the ground freezing operation stopped for the mine shaft freezing engineering.The ground freezing pipe backfill technology with the saltwater cement slurry could well solve the ice jamming problem of the conventional cement slurry and water bearing material during the backfill of the ground freezing pipe under the minus temperature environment and could realize a intime backfill of the freezing pipe after the ground freezing operation stopped.The backfill would not only ensure the construction quality,but could reduce the construction period and also could prepare the operation site in advance for the late miner shaft permanent lock and the winch exchanging construction.The technology was applied to several mine freezing shaft sinking projects one after another with the successful applications.The backfill technology could provide the new operation means to the mine freezing shaft sinking projects,found a new approach to handle the waste saltwater and would be a green environment protection technology.The backfill technology would play an active role to promote the development of China ground freezing method mine shaft sinking technology.

关 键 词:盐水水泥浆 冻结管 充填 负温环境 

分 类 号:TD265.34[矿业工程—矿井建设]

 