上海市市级医院科教综合楼项目全过程BIM应用及价值分析  被引量:5

BIM APPLICATION IN THE WHOLE PROCESS AND VALUE ANALYSIS OF COMPLEX BUILDING PROJECT IN SHANGHAI MUNICIPAL HOSPITAL SCIENCE AND EDUCATION

在线阅读下载全文

作  者:张建忠[1] 余雷[2] 李永奎[3] Zhang Jianzhong;Yu Lei;Li Yongkui

机构地区:[1]上海市卫生基建管理中心,上海200086 [2]上海市胸科医院,上海200030 [3]同济大学,上海200092

出  处:《中国医院建筑与装备》2018年第3期78-84,共7页Chinese Hospital Architecture & Equipment

摘  要:文章以上海市胸科医院新建科教综合楼为例,介绍了BIM技术和项目管理充分结合进行项目前期、设计、施工准备、施工等全过程以及进度、投资和质量控制全方位BIM应用的具体做法;阐述了BIM应用的组织、管理和信息化应用措施,以及该项目所取得的实际效果。The article takes the newly constructed science and education complex building of Shanghai Chest Hospital as an example,introduces the full integration of BIM technology and project management in the preliminary stage,design stage,construction preparation and construction,and the concrete practice method of BIM application in progress,investment and quality control;expounds the organization,management and informatization of BIM application,as well as the actual effect of the project.

关 键 词:上海市市级医院 科教综合楼 医院建筑 项目管理 建筑信息模型 

分 类 号:R197.38[医药卫生—卫生事业管理] TU17[医药卫生—公共卫生与预防医学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象