检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苏瀚波 SU Hanbo(Jianggan District Urban Construction Comprehensive Development Co.,Ltd.,Hangzhou Zhejiang 310000,China)
机构地区:[1]江干区城市建设综合开发公司,浙江杭州310000
出 处:《工程质量》2018年第4期38-43,共6页Construction Quality
摘 要:石祥路提升完善工程跨京杭运河桥设计为双层钢箱梁,其中下层辅道桥钢箱梁位于门式桥墩中间,下挂于上层钢箱梁底部,架设施工难度较大。本工程创新地采用先在上层高架底部安装穿巷式下挂轨道,再安装四部电动滑车,用运梁船将待架梁段运输到桥梁下方,用4部电动滑车同步提升钢箱梁到指定高度,再利用电动滑车的行走系统将待架梁段送到待架梁位的施工工艺,安全快速地完成了本工程南线和北线两联下挂桥的架设任务。本文重点讲述了穿巷式下挂轨道配合电动滑车组架设钢箱梁施工工艺和控制要点。Shixianglu improve perfect engineering was designed double-layer steel box girder bridge across Hangzhou canal,in which the lower causeway bridge steel box girder was located in the middle gate piers,hung at the bottom of the upper steel box girder;its erection construction was difficult.The engineering adopt innovatively the upper first elevated installed under wear lane type hanging at the bottom of the track,then made installation of four electric blocks,used beam will stay frame beam section of the transport ship to the bridge below,ascended simultaneously with four electric steel box girder to the specified height,reused motor block system will walk with frame beams to with frame beam and a construction technology,safety quickly finished the project under the southern and northern two couplet hanging bridge construction tasks.This paper expounded emphatically construction process and control points of this new technology.
关 键 词:穿巷 下挂轨道 电动滑车 架设 下挂钢箱梁 施工
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.139.22