检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李高鹏 Li Gaopeng(Shanxi FenXi shuguang coal mining group,Shanxi xiaoyi 032308)
机构地区:[1]山西汾西矿业集团曙光煤矿,山西孝义032308
出 处:《煤矿现代化》2018年第4期20-23,25,共5页Coal Mine Modernization
摘 要:为了解决1307巨厚煤层工作面顺槽变形严重的问题,文中采用数值模拟的方法,设计了3种顺槽支护方案,并对各方案进行模拟,结合巷道控制效果及经济投入,最终确定了方案3(3根长锚索+2根短锚索)为最优支护方案。经过对巷道支护效果的考察,确定新型支护方式能够对巷道围岩得到有效控制。in order to solve the huge thick coal seam working face 1307 gateway deformation serious problem,this paper adopts the method of numerical simulation,the design of the three kinds of gateway support scheme,and used for simulating the scheme,and combined with the control effect of roadway and economic investment,ultimately determines the scheme 3(three long anchor cable+two short anchor cable)for the optimal supporting scheme.Effect of roadway support,determined new supporting method can effectively control of surrounding rock of roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.56