检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:任祥林 Ren Xianglin(Shanxi Fenxi Mining Group Nanguan coal industry,Shanxi Jinzhong 031300)
机构地区:[1]山西汾西矿业集团南关煤业,山西晋中031300
出 处:《煤矿现代化》2018年第4期129-131,共3页Coal Mine Modernization
摘 要:文中首先分析了临近CF7含水断层的围岩水文地质情况,确定了9301工作面沿断层布置,设置保护煤柱的采煤工作面布置。为了确定临近CF7含水断层的保护煤柱合理尺寸,文中根据实际情况,建立了数值计算模型,根据水压与岩层阻水能力计算,CF7断层防水保护煤柱留设58.4m宽度的煤柱,以确保采区安全回采。in this paper,we first analyzed the hydrogeological condition of surrounding rock near the CF7 water cut fault,and determined the layout of the 9301 working face along the fault and set the protective coal pillar for the coal face.In order to determine the reasonable size of the protective coal pillar near the CF7 water cut fault,according to the actual situation,a numerical calculation model is established.According to the calculation of water pressure and water resistance ability of the rock stratum,the CF7 fault waterproof protection coal pillar is left with 58.4m width coal pillar to ensure the safe mining in the mining area.
分 类 号:TD745.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33