检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:晋良海[1] 李宬 郑霞忠[1] 郝胜 韩兰珍[1] 梁巧秀 JIN Liang-hai;LI Cheng;ZHENG Xia-zhong;HAO Sheng;HAN Lan-zhen;LIANG Qiao-xiu(College of Water Conservancy and Environment,China Three Gorges University,YiChang 443002,China;MinFa Group Corpation,XiangYang 441000,China)
机构地区:[1]三峡大学水利与环境学院,湖北宜昌443002 [2]民发实业集团有限公司,湖北襄阳441000
出 处:《管理工程学报》2018年第2期202-206,共5页Journal of Industrial Engineering and Engineering Management
基 金:湖北省自然科学基金资助项目(2014CFB690);国家自然科学基金资助项目(51379110)
摘 要:针对建筑企业在工程变更时产生的沉没成本问题,引入解释水平理论,构建解释水平与情景交叉的沉没成本效应四表格卡方检验模型,并借助对比实验手段分析决策主体沉没成本效应的差异,以揭示工程变更决策沉没成本效应规律。实验结果表明:(1)采用低水平解释,决策主体在面对生活情境或工程情境的沉没成本时,都会产生沉没成本效应;采用高水平解释,工程情境容易产生沉没成本效应,而生活情境很少产生沉没成本效应。(2)同一情境下,决策主体采用低水平解释比高水平解释更容易产生沉没成本效应;同一种解释水平下,决策主体在工程情境中比在生活情境中更容易产生沉没成本效应。研究结果可为工程变更决策主体的理性选择提供理论支持。When construction enterprises face influence from market economy,natural environment,engineering condition,and policy adjustments,they would usually choose to change engineering to avoid risks and interference.However,changing frequently in engineering might cause sunk cost effect,which will influence decision makers’rational choice.As a result,both theoreticians and engineers in construction business pay attention to how to improve the decision level for sunk cost effect.Recently,most researchers have focused on two aspects:main effect on decision-making and negative influence on sunk cost effect.Few systematic theories can explain the sunk cost effect of engineering change decisions.The paper adopts the construal level theory to explain the sunk cost effect of level and situation by constructing a four table chi-square model,which discusses the decision criterion by decision-makers from the perspective of psychological distance in an experiment.It analyzes the consequences of different decisions to reveal the law of sunk cost effect in engineering change decision,which can provide theoretical guidance for engineering change management and avoid unreasonable sunk cost effect.The paper involves two parts.In the first part,the paper mainly builds a four table chi-square model.Firstly,some theories,application status and engineering significance about construal level will be introduced.Secondly,the author designs an experiment to understand the sunk cost effect of decision makers in different situations(life situations and engineering situations)and different construal levels(self-decision and help others decide).Finally,the basic steps of four table chi-square test will be displayed.In the second part,the paper mainly discusses chi-square tests in four aspects(different construal level sunk cost effect in life situations,different construal level sunk cost effect in engineering situations,the relationship between construal level and sunk cost effect arisen from decision-makers,the relationship between situations
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.134.105.118