作 者:陈伟楠[1] 杨清[1] 刘天顺[1] 郭淑琴[1] Chen Weinan;Yang Qing;Liu Tianshun;Guo Shuqin(Tianjin Municipal Engineering Design&Research Institute,Tianjin 300392,China)
出 处:《环境保护科学》2018年第2期46-50,共5页Environmental Protection Science
摘 要:随着天津市地方标准《天津市城镇污水处理厂污染物排放标准》(DB12/599-2015)的发布,天津市内各污水处理厂均面临提标改造问题。由于部分城镇污水处理厂进水混有一定比例的工业废水,因此原水组成较为复杂、难降解有机物浓度较高,这对污水厂提标改造中COD_(Cr)达标造成了较大困难。文章以天津市某污水处理厂为例,对芬顿法、臭氧氧化法等COD_(Cr)深度处理工艺进行对比分析,结果表明,采用臭氧电磁催化氧化工艺在工程投资及运行成本上均具有一定优势。With the release of the local standard for pollutant discharge from urban sewage treatment plants(DB12/599-2015),the sewage treatment plants in Tianjin were confronted with the issue of process selection in upgrading.Due to the influents of some urban sewage treatment plant mixed with a certain percentage of industrial wastewater,composition of the raw water was more complicated with higher concentration of non-biodegradable organic matters,leading to a great difficulty in complying with the standards for COD Cr during upgrading of the treatment plants.In this paper,a certain sewage treatment plant in Tianjin was taken as an example and advanced COD Cr treatment processes such as Fenton and ozone oxidation methods were compared and analyzed.The results showed that ozone electromagnetic oxidation process effectively reduced the project investment and running costs.
关 键 词:提标改造 高级氧化 臭氧电磁催化氧化 CODCR 投资及成本
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.17.175