炉外法冶炼烟帽的一种吊装方法  

A HOISTING METHOD FOR SMELTING SMOKE CAP BY OFF-FURNACE METHOD

在线阅读下载全文

作  者:刘军正 LIU Jun-zheng(Jinzhou New China Dragon Molybdenum Industry Co.,Ltd.,Jinzhou 121000,Liaoning,China)

机构地区:[1]锦州新华龙钼业股份有限公司,辽宁锦州121000

出  处:《中国钼业》2018年第2期41-44,共4页China Molybdenum Industry

摘  要:炉外法冶炼时需要把烟帽从上一个炉壳挪到下一个炉壳上,挪动过程使用吊车吊运,需要2次爬上炉壳挂摘4吊钩,这个过程需要接近10 min,每天冶炼炉次较多时,需要大量时间挪烟帽。通过改进,不再使用吊车挪烟帽,烟帽只在冶炼间内做上下运动,通过选用改装的卷扬机,采用合适的绕绳方法,采用链条和钢丝绳组合,可大幅降低操作时间,提高效率。In the process of smelting outside the furnace,the smoke cap need to be moved from the previous shell to the next shell.In the moving process,the crane was used to lift 4 load hooks twice,which took approximately 10 minutes.Because of many furnaces production,lots of time was wasted to move the cap.By improvement,the crane was no longer used to move the cap,the cap only moved up and down in the smelting room.By using modified winder,appropriate roping methods,chain and wire rope combination,the operation time was greatly reduced and the efficiency was improved.

关 键 词:升降烟帽 炉壳 卷扬 

分 类 号:TF841.2[冶金工程—有色金属冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象