检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李春松 LI Chun-song(Guangzhou Sifangbangde Industrial Co.,Ltd.,Guangzhou510663,China)
机构地区:[1]广州四方邦德实业有限公司,广东广州510663
出 处:《机电工程技术》2018年第4期152-155,共4页Mechanical & Electrical Engineering Technology
摘 要:当前,我国早期建设的很大一部分中小型水电厂仍采用非微机保护装置,随着设备运行的时间加长,进行微机化改造越来越紧迫。从湘东某水电厂送出线路微机改造出发,以点带面,从装置的选型和设计,装置的安装、调试等方面提出了个人的看法,供同类型的技术改造项目参考。Currently,a very large number of small and medium-sized hydropower plants that were built early still uses uncomputerized protection systems.As equipment operation period increases,it becomes more and more urgent for these hydropower plants to transform into computerized protection systems.This essay begins from the computerization of outgoing transmission lines of a hydropower plant in east Hunan province,and uses this example to illustrate and raise personal views on the selection and design of equipment,the installation,adjustment and testing of equipment,etc.,to provide a reference for the technical transformation projects of the similar type.
分 类 号:TV735[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104