综放工作面边采边加液压支架实践应用与研究  

The Practical Application and Research of Hydraulic Support Installing Technology While Ming in the Fully Mechanized Working Face

在线阅读下载全文

作  者:胡盼 孙成山 Hu Pan;Sun Cheng-shan(Tianchen Coal Mine,Zaozhuang Coal Mining(Group)Co.,LTD.,Shandong Zaozhuang 277523)

机构地区:[1]枣庄矿业(集团)有限责任公司田陈煤矿,山东枣庄277523

出  处:《山东煤炭科技》2018年第4期22-23,共2页Shandong Coal Science and Technology

摘  要:受断层影响综采工作面的巷道布置不规则,需要边采边加液压支架,受后部运输机限制,边采边加液压支架工艺难度增大。结合3_下7110综放工作面边采边加液压支架工艺流程,探讨了一些有效做法,为相似情况下的开采提供基础素材。Being affected by the fault,the working face is laid out irregularly,needing to install hydraulic support while mining.However,restricted by the rear conveyer,it is becoming increasingly difficult to install hydraulic support while mining.Combined with 3 lower 7110 fully mechanized top coal caving face mining side plus hydraulic support technology process,we explored some effective practices to provide basic materials for similar mining.

关 键 词:综放 调面 工艺 

分 类 号:TD355.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象