检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:仇卫军 崔彬 Qiu Weijun;Cui Bin(Dafeng Secondary Specialized School of Jiangsu Province,Yancheng Jiangsu 224100,China)
机构地区:[1]江苏省大丰中等专业学校,江苏盐城224100
出 处:《信息与电脑》2017年第22期163-165,共3页Information & Computer
摘 要:水平布线双绞线的计算是网络综合布线系统设计的重点内容。基于此,先介绍了传统综合布线系统设计中的水平布线双绞线的计算方法,然后阐述了网络综合布线系统设计中水平布线双绞线的计算方法——工程预算法,最后通过工程实例对这两种计算方法进行了比较,以帮助相关人员选择更加准确的计算方法。The calculation of horizontal twisted pair is the key point of the design of network cabling system.Based on this,this paper first introduces the calculating method of the traditional design of integrated wiring system in horizontal twisted pair wiring,and then expounds the calculation method of the network cabling system design of horizontal cable twisted pair-project budget method,finally compares two kinds of calculation methods through the engineering examples,to help relevant personnel choose more accurate calculation methods.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.208.57