金沙江乌东德水电站施工供电规划设计简介  被引量:2

On the Planning and Design of Construction Power Supply System in Wudongde Hydropower Station

在线阅读下载全文

作  者:李莎 吴超 LI Sha;WU Chao(Changjiang Survey,Planning,Design&Research Co.,Ltd.,Wuhan 430100,China)

机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430100

出  处:《水电与新能源》2018年第4期31-35,共5页Hydropower and New Energy

摘  要:通过对乌东德水电站施工供电系统的规划设计,本人的主要体会是:(1)以施工组织设计方案为基础,包括负荷水平、负荷性质、负荷分布等重要基础资料;(2)使施工供电系统更好的适应厂内交通规划,施工进度等;(3)选择变电站容量、规模、输电线路的规格时,应考虑适当裕量,站址和线路路径尽量与施工总布置协调。The planning and design of the construction power supply system in Wudongde Hydropower Station is introduced.The construction organization design scheme is the basis of this work,including the basic information such as the power load level,property and distribution.Then,the construction power supply system should be compatible with the in-plant traffic planning and the construction progress.Also,in the selection of the substation size and capacity and the specification of the transmission lines,adequate redundancy should be provided.The location of the substation and the transmission line path should be compatible with the general layout of construction.

关 键 词:水电站 施工供电系统 供电规划 

分 类 号:TV73[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象