检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李杨 李朝奎[1,2,3] 方军 吴柏燕[1,2,3] 陈爱民 LI Yang;LI Chaokui;FANG Jun;WU Baiyan;CHEN Aimin(Hunan University of Science and Technology National-local Joint Engineering Laboratory of Geo-spatial Information Technology,Xiangtan 411201,China;Hunan University of Science and Technology Geo-spatial Information Engineering Laboratory of Hunan Province,Xiangtan 411201,China;Geo-spatial Information Applied Engineering Technology Research Center of Xiangtan,Xiangtan 411000,China)
机构地区:[1]湖南科技大学地理空间信息技术国家地方联合工程实验室,湖南湘潭411201 [2]湖南科技大学地理空间信息湖南省工程实验室,湖南湘潭411201 [3]湘潭市地理空间信息应用工程技术研究中心,湖南湘潭411000
出 处:《地理信息世界》2018年第2期97-101,共5页Geomatics World
基 金:国家自然科学基金项目(41271390);湖南省教育厅重点项目(16A070);湖南省自然科学基金湘潭联合基金项目(2017JJ4037)资助
摘 要:为实现大范围地质灾害预警实时分析计算,搭建了地质灾害预警并行计算架构。结合地质灾害隐患点的现状和监测设备的实际情况,以地质灾害隐患点为分析计算单元,采用数据级并行计算方式对地质灾害计算任务进行分解,实现了任务生成、分解、派发、计算等功能;采用MPI和Socket套接字相结合的方式,达到了并行计算与高效通信的目的;将该并行计算架构应用于某省2016年8月2~4日台风造成的大范围强降雨状况下的地质灾害预警计算实验验证。结果表明:在大范围地质灾害预警中,该并行计算架构随着执行进程数增加而获得一定的加速比,当执行进程达到16个时加速比可达5.652,明显缩短了传统串行计算所需要的时间,实现了地质灾害的实时预警。In order to realize the real-time analysis computing of large-scale geological disaster warning,the parallel computation structure of geological hazard early warning is set up.Taking hidden geological hazard points as analysis computing unit,combined with their current circumstances and the actual situation of monitoring equipment,data-level parallel computing method is adopted to decompose the geological disaster computing tasks,to complete task generation,decomposition,distribution,computation and so on.The efficient communication of parallel computation is realized through the combination of MPI and Socket sockets.The parallel computing framework is applied to a geological hazard early warning and calculation experiment in the case of large-scale heavy rainfall caused by the typhoon on August 2~4,2016.The results show that the parallel computing framework has significantly shortened the time required for traditional serial computing and has implemented preliminarily the real-time warning of geological hazards in the early warning of large-scale geological disasters.
分 类 号:P208[天文地球—地图制图学与地理信息工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.241.79