作 者:孙文博 成闻 刘艳鹏 樊宝华 王雪华 SUN Wenbo;CHENG Wen;LIU Yanpeng;FAN Baohua;WANG Xuehua(Sino-pipeline International Company Limited,Beijing 100007,China)
出 处:《石油工程建设》2018年第2期51-55,共5页Petroleum Engineering Construction
摘 要:根据中哈天然气管道实际情况,为保证建设工期和运行维护要求,从安全、可靠、实用等角度考虑,哈萨克斯坦压缩机站设计采用天然气发电机、配套自动化控制系统的自发电供电方案。阐述了负荷分析、发电机配置方案、发电站电气主接线方案、电站控制系统(ECS)的应用以及发电站假负载配置等技术要点。该技术极大地保证了电站的可靠性和稳定性。可为今后压缩机站项目自发电电站的设计和运行提供宝贵的经验。According to the actual situation of Kazakhstan-China Gas Pipeline and in order to ensure the construction period and operation maintenance,the power supply design scheme for compressor stations in Kazakhstan-China Gas Pipeline adopts the natural gas generator and automatic control system for self-generating electricity after considering the safety,reliability,practicability and other factors.This paper illustrates the technical key points including load analysis,generator configuration scheme,power station electrical main wiring scheme,electric control system(ECS)application,dummy load configuration.It provides a strong guarantee for the safe and reliable operation of the power station.
关 键 词:压缩机站 天然气发电机 电站控制系统(ECS)
分 类 号:TE974[石油与天然气工程—石油机械设备] TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.129.134