检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜银华 朱占东 孙茂前 JIANG Yin-hua;ZHU Zhan-dong;SUN Mao-qian(Survey Business Department,State Nuclear Electric Power Planning Design&Research Institute Co.,Ltd.,Beijing 100095,China;Pan-China Construction Group Co.,Ltd.,Beijing 100070,China)
机构地区:[1]国核电力规划设计研究院有限公司,北京100095 [2]北京泛华建设有限公司,北京100070
出 处:《电力勘测设计》2018年第A01期6-11,共6页Electric Power Survey & Design
摘 要:近年来,特高压输电线路工程建设逐渐增多,所经地区地质条件也越来越复杂。本文以溪浙±800k V线路工程施工图勘察设计为工程背景,研究在水平荷载作用下人工挖孔灌注桩基础围岩应力和变形的分布和消散规律,从而判断塔基位于某一具体地质陡坡的稳定性。In recent years,the ultra-high voltage transmission line projects have been developed gradually,and the geological conditions of the regions which the UHV transmission lines pass through also become more and more complicated.The theme of the thesis is to research the profile and dissipation rules of surrounding rock stress and deformation nearby the manual hole digging cast-in-situ pile foundation which is under the action of the horizontal load on the background of The XIZHE±800kV UHV transmission line project construction survey and design,and then to evaluate the stability of a geological steep slope which a tower is placed on.The research results can provide a reference for how to select locations of tower foundations.
分 类 号:P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.242.179