检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄明皎 HUANG Ming-jiao(Northeast Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Changchun 130021,China)
机构地区:[1]中国电力工程顾问集团东北电力设计院有限公司,吉林长春130021
出 处:《电力勘测设计》2018年第A01期179-184,共6页Electric Power Survey & Design
摘 要:近年来电厂燃煤铁路运输车辆除普通C60、C70型铁路敞车外,越来越多地开始采用C80型列车,绥中电厂二期工程即是采用三节一组式C80型及C60、C70等车型进行燃煤运输。结合绥中工程设计的实际情况,本文介绍了三节一组式C80与C60、C70车型通用的单车翻车机卸煤系统的设备及布置特点,与普通单车翻车机系统的不同点,供今后工程借鉴。In coal-fired power plant,60 t and 70 t wagons were widely used for coal transportation,but in recent years,80 t wagons become increasingly co mmon in use.In Suizhong power plant phaseⅡ,trinity 80 t wagons,60 t and 70 t wagons are all used for coal transportation.On the basis of design experience in Suizhong Power Plant,this thesis introduce the characteristic of this universal wagon tipper for three type of wagons told above,the key point of universal tipper system arrangement design,and difference between universal wagon tipper system and co mmon wagon tipper system.
关 键 词:翻车机系统 三节一组式C80型敞车 C60及C70型敞车
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49