检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡婷 Hu Ting(Eleventh Oil Recovery Plant of Changqing Oilfield Company,Qingyang 745000,Gansu,China)
机构地区:[1]长庆油田分公司第十一采油厂,甘肃庆阳745000
出 处:《石化技术》2018年第7期97-97,122,共2页Petrochemical Industry Technology
摘 要:油井开发后期,随着采出液中含水率越来越高,经常会出现因窜槽、注入水突进或其他原因引起的过早见水或水淹现象,给油井开采带来安全隐患,堵水是解决这一问题的常见技术措施;但堵水技术现场实施过程中,往往会出现一些问题,本文就这些问题加以分析,并提出相应的解决措施。The oil well development,As the water content in the produced liquid is getting higher and higher,there is often the phenomenon of premature flooding or water flooding caused by channeling,water injection,or other reasons.Bring safety hazards to oil wells.Water plugging is a common technical measure to solve this problem.However,there are always some problems in the implementation of water plugging technology.This paper analyzes these problems and puts forward corresponding solutions.
分 类 号:TE358.3[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249