检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]唐山国华科技国际工程有限公司,河北唐山063020
出 处:《煤炭加工与综合利用》2018年第7期4-7,共4页Coal Processing & Comprehensive Utilization
摘 要:介绍了吕梁DJ选煤厂扩能技改工程的特点:采用1台S-3GHMC870/295型超级无压给料三产品重介质旋流器取代原有的3GHMC1300/920重介质旋流器,同时适当增减其他设备,将该厂设计生产能力由1.80 Mt/a扩大到4.22 Mt/a,工程投资约2 300万元,单位投资9.49元/t,工期55 d,投产后达到了预期效果。This paper introduces the characteristics of the technical reformation project for capacity expansion in Lvliang DJ Coal Preparation Plant. The 3 GHMC1300/920 heavy medium cyclone is replaced by a S-3 GHMC870/295 super three-product heavy medium cyclone of no feeding pressure.At the same time, through some modification on other equipment, the design production capacity of plant is expanded from 1. 80 Mt/a to 4. 22 Mt/a. The investment of this project is about 23 million Yuan,and the unit investment for one ton of raw coal processed is 9. 49 Yuan. The construction period is 55 days. The expected results are achieved after production.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.48