武汉阳逻港三作业区起步阶段工程码头基础设计研究  被引量:1

Design research on pier foundation of the start stage project in the three areas of Wuhan Yangluo Port

在线阅读下载全文

作  者:刘潜兵 杨玉勤 LIU Qian-bing;YANG Yu-qin(CCCC Second Harbor Consultants Co.,Ltd.,Wuhan,Hubei 430060,China)

机构地区:[1]中交第二航务工程勘察设计院有限公司,湖北武汉430060

出  处:《中国港湾建设》2018年第8期24-29,共6页China Harbour Engineering

摘  要:以武汉新港阳逻港区三作业区一期工程起步阶段工程为实例,针对工程区域局部有矶头分布、基岩埋深浅且岩面陡、水位差和水流流速大、使用荷载大等建设条件,对码头结构选型、桩基布置与优化、稳桩等问题进行了深入分析与研究,并通过基桩自平衡法验证桩的竖向抗压极限承载力。工程实施后效果良好,相关结论可供类似工程建设条件的码头结构设计参考。Taking the start stage project of the three areas phase玉project of Wuhan Newport Yangluo Port as an example,in view of the construction conditions,such as the engineering area local angeles head distribution,the shallow buried depth of bedrock and steep rock surface,the large water level difference and flow velocity,and large service load,we analyzed and studied the selection of pier structure,pile foundation arrangement and optimization,and the stabilizing piles,and verified the vertical compressive ultimate bearing capacity of pile by the pile self-balancing method.After project implementation effect is good,the relevant conclusion can be used as reference for pier structural design under similar engineering conditions.

关 键 词:浅层岩基 岩面陡 水平变位 桩基布置 稳桩 基桩自平衡检测 

分 类 号:U652.7[交通运输工程—港口、海岸及近海工程] U655.544.1[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象