检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:布亚芳[1] 孙琳[1] 刘柳[1] 李磊 BU Yafang;SUN Lin;LIU Liu;LI Lei(Department of Civil Engineering,Hebei Jiaotong Vocational and Technical College,Shijiazhuang 050091,Hebei, P.R.China;Shijiazhuang Plank Green Project Co.Ltd.,Shijiazhuang,Hebei,P.R.China)
机构地区:[1]河北交通职业技术学院土木工程系,河北石家庄050091 [2]石家庄市环路绿化工程有限公司,河北石家庄050091
出 处:《重庆交通大学学报(自然科学版)》2018年第9期23-27,共5页Journal of Chongqing Jiaotong University(Natural Science)
摘 要:城市地铁隧道开挖往往会下穿、侧穿建(构)筑物。为保证隧道顺利开挖,有必要对既有结构进行受力与变形研究。以西安地铁四号线某区间盾构侧穿高架桥施工为例,通过数值模拟和实时监测分析盾构侧穿高架桥桩所引起的受力与变形,并将数值计算得出的沉降值与实际监测值进行对比。结果表明:盾构在砂层环境下,土压力的大小对地表沉降的影响较大;桥墩对地表沉降有一定的约束作用,盾构施工中在合适的地方布置桩基,能有效的减小既有结构的沉降。研究结果可供类似盾构侧穿风险源参考。Most of urban subway tunnel excavations often pass underneath and alongside buildings or structures.In order to ensure the smooth excavation of tunnels,it is necessary to study the force and deformation of the existing structures.Based on the shield construction passing alongside a viaduct in a section of Xi an Metro Line 4,the force and deformation caused by the shield passing alongside the viaduct pier was analyzed by means of numerical simulation and on-site monitoring;and the settlement value calculated by numerical calculation was compared with the actual monitoring value.The results show that:the size of earth pressure has great influence on the surface subsidence for the shield construction in the sand layer environment,and the pier has certain restraining effect on the surface settlement.The settlement of the existing structure can be effectively reduced by proper placement of pile foundation in the shield construction.The above conclusions can provide reference for the risk sources of similar shield passing alongside.
关 键 词:岩土工程 土压平衡盾构 近距离 侧穿 高架桥 受力与变形
分 类 号:U24[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.118