基于椭球体失稳坍落理论的隧道掌子面失稳计算研究  被引量:7

Study of Failure Calculation of Tunnel Face Based on Drawing Ellipsoid Theory

在线阅读下载全文

作  者:杜俊[1,2] 梅志荣[2] 陈永照 DU Jun;MEI Zhirong;CHEN Yongzhao(China Academy of Railway Sciences,Beijing 100081,China;China Railway Southwest Research Institute,Co.,Ltd.,Chengdu 611731,Sichuan,China;Xiamen Municipal Development Corporation,Xiamen 361015,Fujian,China)

机构地区:[1]中国铁道科学研究院,北京100081 [2]中铁西南科学研究院有限公司,四川成都611731 [3]厦门市政建设开发公司,福建厦门361015

出  处:《隧道建设(中英文)》2018年第9期1497-1504,共8页Tunnel Construction

基  金:科技部科研院所技术开发计划专项(2012EG123032)

摘  要:为研究维持软弱围岩隧道掌子面稳定所需的掌子面支护力,以筒仓理论和太沙基压力理论为基础,借鉴运用椭球体失稳坍落理论,建立隧道掌子面失稳理论计算模型,推导隧道掌子面失稳计算公式,求出维持掌子面稳定的最小支护力和完整失稳坍落椭球体的临界埋深值。通过分析隧道埋深与坍落椭球体高度的4种位置关系对计算参数的影响,给出不同位置关系情况下竖向深度z和作用于椭圆台台面的土压力q0的求解方法,并将推导公式与经典公式进行对比,验证推导公式的合理性。最后,运用推导出的隧道掌子面失稳计算公式对实例进行分析,求得维持掌子面稳定的掌子面最小支护比,并用数值模拟方法进行验证。验证结果表明:推导公式与数值模拟结果具有较好的一致性。The instability model of tunnel face is established based on silo theory,Terzaghi′s theory and collapse theory of ellipsoid,so as to study the supporting force for maintaining the stability of tunnel face in soft surrounding rock.The formula for calculating the instability of tunnel face is derived and the minimum supporting force of tunnel face and the critical height of complete slump ellipsoid are obtained.And then the values of vertical depth z at different position relationships and soil pressure q 0 on ellipsoid surface are given by analyzing four positional relationships between tunnel depth and height of slump ellipsoid.The rationality of the derivation formula and classic formula is verified by comparing.Finally,the ratio of minimum supporting force for maintaining the stability of tunnel face is obtained by a case study.The results indicate that the derivation formula is consistent with numerical simulation.

关 键 词:隧道掌子面 失稳理论模型 椭球体失稳坍落理论 最小支护力 

分 类 号:U451.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象