作  者:池秀文[1] 郑祖静 田维西 余少平 吕占胜 牛宏震 CHI Xiuwen;ZHENG Zujing;TIAN Weixi;YU Shaoping;LV Zhansheng;NIU Hongzhen(School of Resources and Environmental Engineering,Wuhan University of Technology,Wuhan 430070,China;WISDRI Engineering&Research Incorporation Limited,Wuhan 430223,China;;School of Resources and Civil Engineering,Wuhan Institute of Technology,Wuhan 430074,China)

机构地区:[1]武汉理工大学资源与环境工程学院,湖北武汉430070 [2]中冶南方工程技术有限公司,湖北武汉430223 [3]武汉工程大学资源与土木工程学院,湖北武汉430074

出  处:《中国矿业》2018年第10期112-116,共5页China Mining Magazine

基  金:中央高校基本科研业务费项目资助(编号:185208012)

摘  要:针对露天矿境界和采剥计划单独优化得到的不是全局最优解问题,提出了境界和采剥计划同时优化方法。通过给定地表约束、帮坡角约束、采剥总量、境界增量等条件构建了一系列地质最优候选境界,对每个候选境界做采剥计划优化,以净现值最大为目标函数,得到了境界和采剥计划同时优化的最优境界。通过建立地表标高模型和矿床数值模型,以及设置帮坡角和技术经济参数约束条件,对某露天铁矿分别采用境界、采剥计划单独优化和境界、采剥计划同时优化的方法进行优化,得到单独优化时最优境界净现值为25.8亿元,同时优化时最优境界净现值为45.7亿元,实现利润净现值增加19.9亿元。结果表明:境界、采剥计划同时优化方法优于境界、采剥计划单独优化方法,能够为露天矿生产决策者提供有利的手段和可靠的参考。Aiming at the problem that the separate optimization of pit boundary and mining-stripping plan for open-pit mine is not the global optimal solution,the simultaneous optimization method of pit boundary and mining-stripping plan was put forward.A series of optimal geological candidates pit boundary were constructed by the conditions of the given surface constraints,slope angle constraint,total exploitation,boundary increment and so on,and then the mining-stripping plan of each candidate pit boundary was optimized.With the maximum NPV as the objective function,the optimal boundary of simultaneous optimization for pit boundary and mining-stripping plan was obtained.By establishing the surface elevation model and the numerical model of the deposit,and setting up the slope angle and the technical and economic parameter constraints,separate optimization method and simultaneous optimization method of pit boundary and mining-stripping plan were respectively used in the open-pit iron mine.When separately optimized,the NPV of optimal pit boundary is 2.58 billion yuan,and when simultaneously optimized,the NPV of optimal pit boundary is 4.57 billion yuan,and the NPV of profit is increased by 1.99 billion yuan.The results show that the simultaneous optimization is better than the separate optimization,which can provide favorable means and reliable references for the decision makers of open-pit production.

关 键 词:露天矿 境界优化 采剥计划优化 单独优化 同时优化 

分 类 号:TD854[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象