检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何敏[1,2] 户莹 李宁[1] 刘波 HE Min;HU Ying;LI Ning;LIU Bo(School of Civil Engineering and Architecture,Xi’an University of Technology,Xi’an,Shaanxi 710048,China;Northwest Investigation Design&Research Institute,Xi’an,Shaanxi 710065,China)
机构地区:[1]西安理工大学土木建筑工程学院,陕西西安710048 [2]西北勘测设计研究院,陕西西安710065
出 处:《西北农林科技大学学报(自然科学版)》2018年第9期131-138,共8页Journal of Northwest A&F University(Natural Science Edition)
基 金:国家自然科学基金项目(50879068);国家自然科学基金创新群体项目(40821001)
摘 要:【目的】针对目前水工压力隧洞配筋设计中公式法、边值法和一般有限元法计算结果差异较大,使工程设计人员难以决断的问题,建立更符合压力隧洞实际工作性态的配筋计算方法。【方法】在剖析现有计算方法基本假定的基础上,建立了一套数值模拟方法,即采用katona裂缝单元模拟衬砌中的裂缝,通过特殊的钢筋及跨缝筋单元模拟钢筋与混凝土相互作用及跨缝处作用机制,推求较为真实的衬砌应力、钢筋应力及裂缝宽度,然后根据设计条件确定配筋方案。【结果】采用建立的数值分析方法,对金沙江鲁地拉水电站压力引水隧洞进行对比计算分析,结果显示,当内水压力水头为1.3 MPa(130m)、围岩为Ⅳ类时,采用建议方法得到的配筋方案为5Φ25(4 900mm2),介于边值法20Φ30(28 260mm2)和公式法3Φ16(1 200mm2)之间。【结论】利用所建立的计算方法得到的配筋结果与实际较为吻合,能够帮助设计人员合理确定水工压力隧洞配筋方案。【Objective】Aiming at of the differences in reinforcement calculation methods such as the formula method,the boundary value method and the general finite element method,a reasonable method was established in this study to guide practical work.【Method】Based on the analysis of basic assumptions of existing methods,a numerical simulation method was established to simulate the cracks in the lining by Katona crack element as well as the interaction between rebar and concrete by the element of rebar across crack.Then,more realistic lining stress,rebar stress and crack width were obtained for better reinforcement scheme according to design conditions.【Result】Based on the established numerical method,the reinforcement design of diversion pressure tunnel of Ludila hydropower station was implemented.When the water pressure was 1.3 MPa(130 m)and the classification of surrounding rock wasⅣ,the proposed method was reinforcement 5Φ25(4 900 mm 2),between the boundary value method 20Φ30(28 260 mm 2)and the formula method 3Φ16(1 200 mm 2).【Conclusion】The results of the established method were in good agreement with actual results,and can help designers to reasonably determine hydraulic pressure tunnel reinforcement.
分 类 号:TV314[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.0.68