检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄伟和[1,2] 刘海 张关平[3] Huang Weihe;Liu Hai;Zhang Guanping(PetroChina Research Institute of Petroleum Exploration and Development,Beijng 10083,China;CNPC Petroleum Engineering Cost Control Center-Langfang,Langfang 065007,China;PetroChina Changqing Oilfield Company,Xi'an 710000,China)
机构地区:[1]中国石油勘探开发研究院,北京100083 [2]中国石油工程造价管理中心廊坊分部,河北廊坊065007 [3]中国石油长庆油田分公司,陕西西安710021
出 处:《工程造价管理》2018年第5期25-31,共7页Engineering Cost Management
基 金:国家科技重大专项"页岩气开发规模预测及开发模式研究"(2016ZX05037-006)
摘 要:目前钻井工程造价管理的突出问题是钻井工程造价信息不对称,使得油气勘探开发项目建设全过程各阶段之间各管理部门之间以及各相关单位之间决策依据不统一,难以实现整体效益最大化。经过10余年的深入研究,建立了一套满足建设全过程管理需要的钻井工程工程量清单计价规则,能够有效解决上述问题。主要内容包括三个部分:第一,钻井工程造价项目构成,包括钻井工程定义、造价项目构成和造价项目分类标准;第二,钻井工程工程量计算规则,包括钻前工程、钻进工程、完井工程和工程建设其他项目的工程量计算规则;第三,全过程钻井工程清单计价规则,包括钻井工程估算、概算、预算、招标、结算、决算的计价规则和造价文件模板。本研究成果已用于国家科技重大专项课题"页岩气开发规模预测及开发模式研究"以及储气库钻井工程概预算和招标文件编制。The problems of drilling engineering cost management is at present the asymmetry of cost information.It makes the decision-making basis not unified between each stage of the project construction process,management departments,the relevant units,and difficult to achieve the maximum benefit.After more than 10 years of in-depth study,a set of"The Bill of Quantities Valuation Rules in Drilling Engineering",to meet the needs of the whole construction management,can be developed to effectively solve the above problems.The main content consists of three parts:1.The construction cost of drilling engineering,including the definition of drilling engineering,the construction of cost project and the classification standard of the project cost;2.Calculation rules of drilling engineering quantity,including the calculation rules of engineering quantity for pre-drilling engineering,drilling engineering,completion engineering and other projects of engineering construction;3.The valuation rules for the whole process of drilling engineering,including the calculation of rough estimate,estimate,budget,tendering,settlement and final accounts and cost document templates;It has been used to research on the scale prediction and development model of shale gas development--National Science and Technology Major Special Project,and to prepare estimating and budgeting and the bidding documents of gas storage reservoir drilling project.
分 类 号:TE29[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30