The market logic of LNG carrier boom  

在线阅读下载全文

作  者:Reporter Zhao Bo 

机构地区:[1]不详

出  处:《中国船检》2018年第10期104-105,共2页China Ship Survey

摘  要:As of August 20,38 LNG carriers have been delivered this year(including 4 floating regasification storage units<FSRU>and LNG bunkers<STS>).In addition,25 LNG carriers will be completed and delivered by the end of this year if everything is on schedule.The annual delivery volume is 63,which is roughly equivalent to the release of one LNG carrier every 140 hours.In addition,statistics shows that at present,the number of new orders for LNG carriers is 43,and the delivery volume will reach 43 and 45 respectively in the next two years.From the aspects of delivery volume,completion speed and orders,the shipyards are very busy.

关 键 词:LNG SHIPYARDS 

分 类 号:U692.7[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象