检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张永健 Zhang Yongjian(Jinneng Group co.,LTD Yangquan Company Shangshe Coal Industry,Shanxi Yuxian 045100)
机构地区:[1]晋能集团阳泉公司上社煤矿,山西盂县045100
出 处:《煤矿现代化》2019年第1期127-129,共3页Coal Mine Modernization
摘 要:为了有效的控制16021工作面运输巷沿空留巷的合理变形,通过分析留巷内基本支护的控制效果,提出在基本支护的基础上进行加强支护及巷旁支护,并对留巷期间围岩变形、锚杆受力状态进行监测。结果表明:运用高水材料进行巷旁充填,工作面后方0~60m围岩移近量大,锚杆载荷增大主要在工作面后方20~40m范围内,该种巷道支护方案能够有效控制沿空留巷围岩变形。In order to effectively control the reasonable deformation of roadway along empty roadway in working face 16021,by analyzing the control effect of basic support in the roadway,it is proposed to strengthen support and side support on the basis of basic support,and monitor the deformation of surrounding rock and the stress state of anchor rod during the period of roadway leaving.The results show that:the high water material is used for the lateral filling of roadway,the wall rock of 0~60m behind the working face has a large amount of displacement,and the increase of anchor load is mainly within 20~40m behind the working face.This kind of roadway support scheme can effectively control the surrounding rock deformation along the empty roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145