检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘伟[1] 姜敬[1] 张登山[1] LIU Wei;JIANG Jing;ZHANG Dengshan(Daliuta Coal Mine,Shenhua Shendong Coal Group,Shenmu,Shaanxi,719300)
机构地区:[1]神华神东煤炭集团大柳塔煤矿,陕西神木719300
出 处:《神华科技》2018年第9期42-46,共5页Shenhua Science and Technology
摘 要:为了实现煤矿综采工作面涌水自动化复用,以大柳塔煤矿52505综采工作面为例,从矿井机电运营角度出发,通过分析采面地质条件,基于水净化硐室及配套设备、矿井已有供排水系统及自动化监控系统,设计安装了供排水管路、电动阀、自动化监控设备,并重新开发编写了自动化控制程序。通过上述一系列设计方案的实施,大柳塔煤矿52505综采工作面日均约400m^3/h的涌水量得到有效控制,并实现了自动化复用于生产。自2016年8月该系统运行以来,减少排水运行人员6人/d,节约排水电费150万元/a,减少污水处理费用288万元/a,减少了设备因水质差更换备件费用约60万元/月。上述结果表明,大柳塔煤矿52505综采工作面涌水自动化复用的设计与应用,为矿井安全治水、低耗排水,高质、稳定供水,提供了可行的途径,为矿井运营创造了巨大的经济效益,对社会环保有积极参考价值。In order to realize the automatic reuse of water inflow in the full-mechanized mining face of coal mine,taking the 52505 full-mechanized mining face of Daliuta Coal Mine as an example,starting from aspects of mine electromechanical operation,through analyzing mining face's geological condition,based on the water purification chamber and corollary equipment,existing water supply and drainage system and automatic monitoring system,water supply and drainage pipelines,electric valves,monitoring devices of automatic equipment are designed and installed,and automatic control program is re-developed and compiled.Through the installation of the above series of design scheme,daily average water inflow-about 400 m3/hour of the 52505 full-mechanized mining face in Daliuta Coal Mine has been effectively controlled,and the automatic reuse of water for production has been realized.Since the new developed system has been launched in August 2016,the number of people operating the drainage operation has been reduced by 6 persons per day,the electricity consumption for drainage has been reduced by 1.5 million per year,the sewage treatment cost has been diminished by 2.88 million per year,and the cost of replacing the equipment due to poor water quality has been decreased by 0.6 million per month.These remarkable achievements indicate that the design and application of the automatic water reuse of the 52505 full-mechanized mining face in Daliuta Coal Mine offers a practical option for sate watercontrol,low consumption drainage and water-supply with stability and quality for the coal mines,and it also creates huge economic benefits for mines'operation,which has a reference value for the social environmental.
关 键 词:煤矿综采面涌水 自动化 供排水 水净化系统 低能耗
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.45.231