Optimized design of drilling and blasting operations in open pit mines under technical and economic uncertainties by system dynamic modelling  被引量:5

Optimized design of drilling and blasting operations in open pit mines under technical and economic uncertainties by system dynamic modelling

在线阅读下载全文

作  者:H.Abbaspour C.Drebenstedt M.Badroddin A.Maghaminik 

机构地区:[1]Institute for Mining and Special Civil Engineering,Freiberg University of Mining and Technology [2]Civil Engineering Department,School of Computing and Engineering,University of Missouri-Kansas City [3]Institute of International Management of Resources and Environment,Freiberg University of Mining and Technology

出  处:《International Journal of Mining Science and Technology》2018年第6期839-848,共10页矿业科学技术学报(英文版)

摘  要:Drilling and blasting are the two most significant operations in open pit mines that play a crucial role in downstream stages. While previous research has focused on optimizing these operations as two separate parts or merely in a specific parameter, this paper proposes a system dynamic model(SDM) for drilling and blasting operations as an interactive system. In addition, some technical and economic uncertainties such as rock density, uniaxial compressive strength, bit life and operating costs are considered in this system to evaluate the different optimization results. For this purpose, Vensim simulation software is utilized as a powerful dynamic tool for both modelling and optimizing under deterministic and uncertain conditions. It is concluded that an integrated optimization as opposed to the deterministic approach can be efficiently achieved. This however is dependent on the parameters that are considered as uncertainties.Drilling and blasting are the two most significant operations in open pit mines that play a crucial role in downstream stages. While previous research has focused on optimizing these operations as two separate parts or merely in a specific parameter, this paper proposes a system dynamic model(SDM) for drilling and blasting operations as an interactive system. In addition, some technical and economic uncertainties such as rock density, uniaxial compressive strength, bit life and operating costs are considered in this system to evaluate the different optimization results. For this purpose, Vensim simulation software is utilized as a powerful dynamic tool for both modelling and optimizing under deterministic and uncertain conditions. It is concluded that an integrated optimization as opposed to the deterministic approach can be efficiently achieved. This however is dependent on the parameters that are considered as uncertainties.

关 键 词:DRILLING and BLASTING UNCERTAINTIES System dynamic modelling Optimization VENSIM 

分 类 号:TD[矿业工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象