检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴凡 瞿森森 WU Fan;QU Sensen(Hubei Qingjiang Hydropower Development Co.,Ltd.,Yichang 443000,China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《电工技术》2018年第19期72-75,共4页Electric Engineering
摘 要:根据隔河岩电厂#3机组开机流程异常退出的故障现象,分析计算机监控系统开机流程对机组转速上升过程异常的判断逻辑,结合调速器电气控制的电液转换过程,通过历史数据趋势分析并比对同型号其它机组正常工况,确定#3机组导叶打开速度受系统油压影响明显,判断异常原因为主配压阀往后的导水机构实际工况偏离正常设计范围,导水机构动作卡阻,控制环阻力偏大。为保障水轮发电机组安全运行,提出针对性解决方案,并完成了相应的技术改造和设备升级。According to the failure of abnormal exit of the start process of Unit#3 in Geheyan Hydropower Plant,the abnormal logic of SCADA was systematically analyzed.Combined with the electro-hydraulic conversion process of the electric control of the governor,the trend analysis of historical data was performed.Compared with the normal conditions of other units of the same model,it was determined that the opening speed of the guide vane of Unit#3 was significantly affected by the system oil pressure.The cause of the fault was the actual working condition of the water diversion mechanism behind the pressure distribution valve had deviated from the normal design range.The action of the water guide mechanism was blocked and the resistance of the control ring was too large.To ensure the safe operation of the hydro-generator units,the specific solutions were proposed and the corresponding technological transformation and equipment upgrades were complemented.
分 类 号:TK730.8[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49