检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨锋[1] 孙晓阳[1] YANG Feng;SUN Xiaoyang(General Contractor of China Construction Eighth Engineering Division Co., Ltd., Shanghai 201204, China)
机构地区:[1]中国建筑第八工程局有限公司总承包公司,上海201204
出 处:《建筑施工》2018年第11期1926-1928,共3页Building Construction
摘 要:以无锡灵山拈花湾酒店工程建设为背景,介绍超大规格幕墙玻璃在复杂作业区间环境下的施工过程,并设计了手动葫芦组合吊装方法及安装平台架,有效地解决了在复杂作业区间内超大规格幕墙玻璃运输与安装的难题,取得了良好的实施效果。Taking the project construction of Lingshan Nianhuawan Hotel in Wuxi as the background,the construction process of ultra-large dimension glass curtain wall in complex working area is introduced,and a combined hoisting method of manual hoist and an installation platform are also designed in this paper,which effectively solve the difficult glass transportation and installation of ultra-large dimension curtain wall and achieve good implementation effect.
分 类 号:TU758.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222