检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:戈西伟 陈宝海 李小光 Ge Xiwei;Chen Baohai;Li Xiaoguang(Chinese People’s Liberation Army 63726 Troops,Yinchuan 750001,China)
机构地区:[1]中国人民解放军63726部队
出 处:《无线互联科技》2018年第20期138-139,共2页Wireless Internet Technology
摘 要:随着光纤通信的发展,光纤网络不断延伸,敷设环境越来越复杂化,如何在复杂环境下保证光缆施工质量是施工中亟待解决的问题。文章结合某部营区光缆工程施工经验,采用分阶段控制节点质量的方法,论述如何在光缆施工的4个质量节点即:前期准备、敷设施工、接续施工及后期维护管理中进行质量控制,为光缆施工全过程质量管理提供参考依据。With the development of optical fiber communication,optical fiber networks continue to extend,laying environment becomes more and more complex.How to keep the optical fiber’s construction quality is a problem that should be solved quickly.Combined with the experience of a military camp,adopting the way of phased controlling node’s quality,discussing how to control quality in the construction of the optical fiber’s four quality nodes that are preparation in advance,cable laying operation,continuous construction and posting maintenance,the article provides reference basis for the quality control of the optical cable’s whole process.
分 类 号:TN929.11[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7