检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梅先志 姚飚[2] 马晓平[2] 陈春才 姜伟 MEI Xianzhi;YAO Biao;MA Xiaoping;CHEN Chuncai;JIANG Wei(China Merchants Heavy Industry(Jiangsu)Co.,Ltd.,Nantong 226100,Jiangsu,China;Jiangsu Modern Shipbuilding Technology Co.,Ltd.,Zhenjiang 212003,Jiangsu,China)
机构地区:[1]招商局重工(江苏)有限公司,江苏南通226100 [2]江苏现代造船技术有限公司,江苏镇江212003
出 处:《造船技术》2018年第6期77-82,共6页
摘 要:基于豪华邮船建造中的薄板平面分段流水线,分析流水线工艺流程,确定流水线生产节拍,配置工位之间的缓冲区,制定流水线计划的标准作业周期,提出流水线计划管控的基本流程和方法,为实现流水线按既定节拍连续、均衡生产创造有利条件。Based on the sheet metal panel block assembly line in the production of luxury cruise,the process flow of the assembly line is analyzed,the takt time of this line is determined,the buffer zone between workstations is configured,the standard operation cycle of the line is formulated,and the basic flow and method of the planning control of the line are proposed,which all create advantages to realize the production of the line according to the established takt time continuously and evenly.
分 类 号:U673.2[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49