作 者:邓培敏 赵向辉 DENG Peimin;ZHAO Xianghui(China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd., Nanning, Guangxi, 530007)
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007
出 处:《红水河》2018年第6期78-81,共4页Hongshui River
摘 要:在输变电工程的建设中,电气主接线中旁路母线在国内已经很少采用,但老挝变电站工程中存在较多带旁路母线的接线形式,且与国内常见带旁路母线的接线存在差异,因此保护配置也有不同。笔者参考国内及国际规范,结合正在建设的老挝230 kV Banlak25变电站工程,对比国内常见旁路接线,对两种旁路接线的保护配置进行研究和探讨,以供今后国内外类似接线的工程参考。In the construction of power transmission and transformation projects,transfer busbar in main electrical connection scheme is seldom used in China,but there are many wiring types with transfer busbar in Laos substation projects,and there are differences with the common wiring with transfer busbar in China,so the protection configuration is also different.Referring to the domestic and international norms and combining with Laos230kV Banlak25substation project under construction,the authors compare the common transfer bus configuration in China and study the protection configuration of the two kinds of transfer bus configuration,so as to provide reference for similar wiring projects at home and abroad in the future.
分 类 号:TM645[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49