Micromine矿业软件在地质勘探及矿山设计中的应用  被引量:2

Application of Micromine mining software in geological exploration and mine design

在线阅读下载全文

作  者:姚树春 Yao Shuchun(Chagnchun Gold Designing Institute Co.,Ltd.)

机构地区:[1]长春黄金设计院有限公司

出  处:《黄金》2018年第12期39-44,共6页Gold

摘  要:随着数字化矿山建设的逐步推广,国外矿山软件逐渐应用于国内矿山。简述了Micromine矿业软件原理,分析了利用传统地质手段在矿床勘探及矿山设计中存在的主要问题,并以长山壕金矿为工程背景,利用Micromine矿业软件解决传统地质手段在矿山设计中存在的问题。工程应用表明:原始地质资料的准确及对矿床成矿规律的正确认识是未来勘探及设计工作的前提;利用价格及企业生产成本作为杠杆,Micromine矿业软件与传统设计手段相结合,优化矿山设计,使之更贴合企业生产实际,实现企业经济效益最大化。With the development of digital mine construction,foreign mining software is more and more used in domestic mines.The paper described the principles of Micromine mining software and analyzed main problems in using conventional geological means to explore deposits and do mine design;in the case study of Changshanhao Gold Mine,Micromine mining software is used,solving the problems conventional geological means have in mine design.Engineering application shows that the accuracy of primary geological data and proper understanding of ore-forming rules are the premises of future exploration and design;with price and production cost as leverage,Micromine mining software and conventional design means are combined,the mine design is optimized to better fit the production practice of enterprises,and the maximum economic benefits of enterprises are realized.

关 键 词:Micromine矿业软件 地质勘探 矿山设计 工业指标 生产成本 

分 类 号:TD679[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象