检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王栋 刘实秋 Wang Dong;Liu Shiqiu(CREEC (Chong qing) Survey, Design and Research Co., Ltd., Chongqing 400023, China)
机构地区:[1]中铁二院重庆勘察设计研究院有限责任公司,重庆400023
出 处:《铁路通信信号工程技术》2018年第12期47-52,共6页Railway Signalling & Communication Engineering
基 金:重庆市建设科技计划项目(城科字2017第1-1-3号)
摘 要:通过分析城际铁路列车折返需求、折返过程、折返间隔限制因素,对比CTCS-2+ATO列控系统与CBTC列控系统在折返站的信号设备布置方式,总结出两种列控系统制式在土建、折返间隔的差异,提出在城际铁路中应用无人自动折返的可行性。This paper analyzes the requirements for train turn-back of intercity railway,turn-back process and turn-back interval limiting factors,compares the signal equipment layout modes of CTCS2+ATO train control system and CBTC train control system in turn-back station,summarizes the differences of civil construction and turn-back interval between the two train control systems,and puts forward the feasibility of application of automatic turn-back technology in intercity railway.
分 类 号:U284.48[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117