大型变压器双侧GIL直连方式的研究  

Research of GIL Connection on Both Sides of Large Transformer

在线阅读下载全文

作  者:林克 沈洪流 王洪梅[2] LIN Ke;SHEN Hongliu;WANG Hongmei(Zhejiang Electric Power Design Institute Co.,Ltd.of China Energy Engineering Group,Hangzhou 310012,China;Zhejiang University of Water Resources and Electric Power,Hangzhou 310018,China)

机构地区:[1]中国能源建设集团浙江省电力设计院有限公司,浙江杭州310012 [2]浙江水利水电学院,浙江杭州310018

出  处:《电工技术》2018年第23期57-61,共5页Electric Engineering

摘  要:在大型电站或变电站中,鉴于大型电力变压器与高压配电装置采用钢芯铝绞线等裸露软导体连接存在的弊端,通过设计L电厂525/230kV联络变压器与两侧GIS的连接方案,提出变压器双侧通过气体绝缘母线(GIL)直连的解决方案,并论述该方案涉及的相关电气技术问题。In the design of large power plants or substations,large power transformer and high-voltage power distribution devices are usually connected with soft bare conductors such as ACSR.However,the entire area will be very large for the longer length of the transformer casing and the requirement for safety distances.In addition,soft bare conductors are easily affected by the environment,resulting in potential safety hazards in power operation.In this paper,through the connection design of 525/230 kV interconnecting transformer and GIS on both sides in L power plant,the solution of the direct connection of the two sides of the transformer through the gas insulated line is proposed,and the relevant electrical technical problems involved in the scheme are demonstrated.

关 键 词:大型电力变压器 高压配电装置 气体绝缘母线 

分 类 号:TM405[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象