检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高普新[1] 张丽敏[1] Gao Puxin;Zhang Limin(China Water Resources Beifang Investigation,Design and Research Co,Ltd.Tianjin,300222)
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2018年第4期38-40,54,共4页Design of Water Resources & Hydroelectric Engineering
摘 要:观景口水利枢纽工程是重庆市重点水源工程之一,工程任务以城市供水为主,同时兼顾小城镇及农村人畜饮水、农业灌溉。泵站从水库通过压力输水隧洞总管引水,在泵站前叉成支管进入泵组,经水泵加压后,汇成一根出水总管至出水池。水泵扬程范围为18.83 m~48.46 m,运行初期设计流量为0.5 m^3/s,设计水平年设计流量为4.76m^3/s,比较选定4台套大泵、2台套小泵匹配变频运行。Guanjingkou Water Control Project is one of the key water source projects in Chongqing. The main task of the project is to supply water in the city, while giving consideration to drinking water for people and livestock and agricultural irrigation in small towns and rural areas. The pumping station diverts water from the reservoir through the main pipe of pressure water conveyance tunnel, forks a branch pipe into the pump group at the front of the pumping station, and assembles an outlet main pipe to the outlet pool after pressurization by the pump. The lift head range of pump is 18.83-48.46 m, the initial design flow is 0.5 m3/s, and the design flow of design level year is 4.76 m3/s. Four sets of large pumps and two sets of small pumps are selected for matching variable frequency operation.
分 类 号:TV213[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222