汉江雅口航运枢纽工程总体布置  被引量:5

General layout of Yakou hydro-junction in Hanjiang River

在线阅读下载全文

作  者:孙保虎 张信伟 胡峰军 杨洪祥 SUN Bao-hu;ZHANG Xin-wei;HU Feng-jun;YANG Hong-xiang(Hubei Provincial Communications Planning and Design Institute,Wuhan 430051,China)

机构地区:[1]湖北省交通规划设计院股份有限公司,湖北武汉430051

出  处:《水运工程》2019年第1期126-130,共5页Port & Waterway Engineering

摘  要:针对汉江雅口航运枢纽工程特点,提出船闸电站同岸布置和异岸布置两种集中布置方案。为寻求最佳工程方案,重点从施工组织、通航条件、泄流能力和工程投资等方面对两种总体方案进行分析比选,论证了同岸布置方案具有投资省、施工组织方便等明显优势,确定枢纽布置采用同岸布置方案。In view of the characteristics of Yakou hydro-junction in Hanjiang River,we propose the centralized layout scheme with shiplock and hydro-power station at the same bank,and the other scheme at different banks.In order to search for the best engineering program,we focus on the analysis mainly from the aspects of construction organization,navigation condition,discharge capacity and engineering investment,and demonstrate that the scheme with shiplock and hydro-power station at the same bank has obvious advantages in comparison with the other scheme in aspects such as the economic investment,convenient construction,etc.As a result,the more reasonable general layout scheme is determined.

关 键 词:汉江雅口航运枢纽 总体布置 集中布置 

分 类 号:U651[交通运输工程—港口、海岸及近海工程] TV61[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象