检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李强 董盛文 LI Qiang;DONG Shengwen(Hubei Institute of Water Resources and Hydropower,Wuhan 430070,China)
机构地区:[1]湖北省水利水电科学研究院,湖北武汉430070
出 处:《中国水能及电气化》2019年第1期60-62,22,共4页China Water Power & Electrification
摘 要:湖北省襄州区龙王镇,建有新、老两个黄茅山水电站。文章主要对老河口市黄茅山新电站对老电站发电的影响进行分析论证。分析论证的方法主要是在溢流堰溢流的前提下,分别针对新电站发电和不发电两种情况,对老电站进水池、尾水渠的水位和老电站发电相关参数进行监测,以此评估新电站对老电站的影响。New and an old Huangmaoshan Hydropower Stations have been built in Longwang Town, Xiangzhou District, Hubei Province. The influence of new Huangmaoshan Power Station in Laohekou on power generation of old power station is analyzed and demonstrated mainly in the paper. The methods of analytic and demonstration mainly include the follows: the water level of old power station intake sump and tailrace as well as related parameters of power generation in old power station are monitored respectively aiming at power generation and none power generation in new power station under precondition of overflow in overflow weir, thereby evaluating the influence of new power station on old power station.
分 类 号:TV737[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.182.56