检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙劲飞[1] 李早元[1] 罗平亚[1] 张刚刚 焦少卿[1,2] SUN Jinfei;LI Zaoyuan;LUO Pingya;ZHANG Ganggang;JIAO Shaoqing(State Key Laboratory of Oil & Gas Reservoir Geology and Exploitation,Southwest Petroleum University,Chengdu,Sichuan 610500,China;Sinopec Southwest Oil & Gas Company,Chengdu,Sichuan 610041,China)
机构地区:[1]"油气藏地质及开发工程"国家重点实验室.西南石油大学,四川成都610500 [2]中国石化西南油气分公司,四川成都610041
出 处:《西南石油大学学报(自然科学版)》2019年第1期111-118,共8页Journal of Southwest Petroleum University(Science & Technology Edition)
基 金:国家科技重大专项(2016ZX05062);四川省科技计划项目(2015SZ0003-004)
摘 要:水平井固井顶替过程中,受限于现场设备,难以实现紊流顶替,而在层流流速区间内,两相流体在偏心环空中运移机制复杂。基于计算流体动力学方法,建立几何模型和数值模型,采用流体体积法对两相流体顶替界面进行追踪,研究了不同顶替流速下水平井偏心环空流体运移机制。结果表明,(1)低偏心度下,1倍隔离液用量能够实现90%顶替效率,而当偏心度大于0.5时,顶替效率相对较低,即使增加隔离液用量,也未能提高顶替效率;(2)针对套管严重偏心情况,将流速由1.0m/s降低到0.2m/s,有助于界面平稳发展,并多置换出6.8%钻井液,解决窄边滞留,宽边指进问题;(3)水平井偏心环空固井注替过程存在偏心效应、重力效应、黏滞效应等多方面影响,这些因素相互制约、相互作用,因此,针对现场实际井况,合理设计固井工艺参数,不仅能提高固井质量,还能起到降本增效的作用。When displacing the cementing of horizontal wells,it is usually difficult to realize the replacement in turbulent flow because of instrumental limitation.In laminar flow,however,the transport mechanism of two-phase flow in the eccentric annulus can be quite complex.Based on the computational fluid dynamics method,we developed a geometric and numerical model,tracked the displacement interface of two-phase flow using the fluid volume method,and analyzed the transport mechanism of displacing fluids in the eccentric annulus of horizontal wells under various displacing flow rates.The following conclusions are drawn from the results:(1)With a low eccentricity,one-time use of isolation fluid can realize 90%displacing efficiency.When the eccentricity is greater than 0.5,the displacing efficiency becomes relatively small.In this case,increasing the amount of isolation fluids cannot further increase the displacing efficiency;(2)Considering the severe eccentricity of the casing,reducing the flow rate from 1.0 m/s to 0.2 m/s can help stabilize the interface and results in 6.8%higher displacement of drilling oil.Furthermore,this approach can also resolve the retention issue on the narrow side and pointing issue on the wide side;(3)The cementing displacement process in the eccentric annulus of horizontal wells is affected by multiple factors,including the eccentric effect,gravity effect,and viscous effect.These factors interact and inhibit with each other.Therefore,a reasonable design of cementing process parameters based on the actual well conditions on site can not only improve cementing quality,but also reduce cost and increase efficiency.
分 类 号:TE256[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30