检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘恩斌[1] 马茜 黎春 向敏 黄立宇 LIU Enbin;MA Xi;LI Chun;XIANG Min;HUANG Liyu(School of Petroleum Engineering,Southwest Petroleum University,Chengdu,Sichuan 610500,China;Beijing Oil and Gas Pipeline Control Center,PetroChina,Dongcheng,Beijing 100007,China;Southwest Pipeline Company,PetroChina,Chengdu,Sichuan 610213,China)
机构地区:[1]西南石油大学石油与天然气工程学院,四川成都610500 [2]中国石油北京油气调控中心,北京东城100007 [3]中国石油西南管道公司成都分控中心,四川成都610213
出 处:《西南石油大学学报(自然科学版)》2019年第1期156-164,共9页Journal of Southwest Petroleum University(Science & Technology Edition)
基 金:国家安全生产监督管理总局项目(sichuan-0013-2016AQ);四川省应用基础研究项目(19YYJC1078)
摘 要:针对最大相对高差达1 432.64 m且含大落差"U"型管段的某原油管线在油顶水投产过程中,原油与水的密度差导致油头行进停滞的问题,提出了在油水界面点附近的阀室,利用压力泄放阀排水泄压的解决方式,基于OLGA多相流瞬态模拟方法,以实际情况为例,对大落差管段的气顶水排水过程进行仿真研究。以泄流孔径为变量,重点研究了流量、压力随时间的变化规律,得到一系列可选泄流孔径及其相应的排水量、流量、压力等随时间变化的关系曲线等。结果表明,选定管段(容量约为6 376.98 m^3)最大排水量可达3 375 m^3,并从经济、安全、有效3个方面分析选出最佳泄流孔径为90~110 mm,与实际情况基本吻合,为解决投产过程中出现类似的异常工况提供实施依据。For oil-after-water commissioning that involves a maximum drop-in-height of 1 432.64 m and uses a crude oil pipeline containing a U-shaped section with a large drop-in-height,the density difference between crude oil and water leads to stagnation issues in the oil head.To resolve this problem,we proposed to drain the pipeline and release pressure using a pressure relief valve installed in the valve chamber near the oil-water interfacial point.Based on the OLGA multiphase flow transient simulation method and taking the actual situation as an example,we simulated the gas-driven water drainage process in the pipe section with a large drop-in-height.Specifically,the simulation focused on analyzing the change in flow rate and pressure over time with varying diameters of the leakage aperture.A series of available sizes of the leakage apertures and corresponding changes in the displacement,flow,and pressure over time were obtained from the simulation.The results demonstrate that the maximum displacement in the selected pipe section(capacity≈6 367.98 m^3)can reach 3 375 m^3.From the perspectives of economy,safety and effectiveness,the best leakage aperture range was found to be 90~110 mm.This number was consistent with that in the actual situation.This study provides a practical basis for alleviating similar abnormal conditions in real production processes.
分 类 号:TE832[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.23.205