火力发电厂脱硫系统中的石膏脱水系统控制策略优化设计  被引量:2

Gypsum Dewatering System in Desulphurization System of Thermal Power Plant Control Strategy Optimization Design

在线阅读下载全文

作  者:胡建垠 

机构地区:[1]大唐环境产业集团股份有限公司特许经营分公司,江苏南京211100

出  处:《工业控制计算机》2019年第1期160-160,共1页Industrial Control Computer

摘  要:目前我国火力发电厂热控DCS控制系统中顺序控制(SCS)功能模块广泛应用于脱硫系统中的烟气系统、吸收塔系统、制浆系统、石膏脱水系统等分系统中,但顺序控制逻辑的设计也存在不合理性,如步序的设计、步序间的等待时间等等。针对抚州电厂脱硫系统中的脱水系统控制策略进行研究并提出优化设计方案,同时也可以提供给其他兄弟单位进行交流、探讨。At present,the sequence control(SCS)function module in thermal control DCS control system of thermal power plants in China is widely used in flue gas system,absorption tower system,pulping system and gypsum dewatering system of desulfurization system.However,the design of sequence control logic is also unreasonable,such as the design of sequence and the waiting time between sequences.In this paper,the control strategy of the dehydration system in the desulfurization system of Fuzhou Power Plant is studied and the optimal design scheme is put forward.

关 键 词:DCS 石膏脱水系统 顺序控制逻辑 优化 

分 类 号:X773[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象