检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李龙龙 李超 刘恒 王国柱 牛伟 张龙 景忠峰 张小峰 腊丹萍 Li Longlong;Li Chao;Liu Heng;Wang Guozhu;Niu Wei;Zhang Long;Jingzhong Feng;Zhang Xiaofeng;Ladanping(College of Geosciences and Engineering,Xi'an Petroleum University,Xi'an 710065,China;No.6 Oil Production Plant of PetroChina Changqing Oilfield Branch,Dingbian,718606,China)
机构地区:[1]西安石油大学地球科学与工程学院,陕西西安710065 [2]中国石油长庆油田分公司第六采油厂,陕西定边718606
出 处:《云南化工》2018年第11期126-127,共2页Yunnan Chemical Technology
摘 要:近几年通过对AB区块开展精细注水调控、不同注水强度注水试验等措施,该区水驱矛盾得到一定程度的缓解,区块生产形势平稳。但地层能量不足、油井见效缓慢、单产低的矛盾依然存在。下步重点在该区扩大规模实施堵水调剖、排状注水试验,提高该区油井单井产能。In recent years,the contradiction of water drive in AB block has been alleviated to a certain extent and the production situation of the block is stable by carrying out fine water injection control and water injection test with different water injection intensity.However,the contradiction of insufficient formation energy,slow oil well effectiveness and low unit production still exists.The next step is to enlarge the scale of water shutoff and profile control and drainage water injection test in this area,so as to improve the productivity of single well in this area.
分 类 号:TE328[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3