某水电站大坝施工导流洞洞线方案比选设计  被引量:2

Comparison and selection design of construction diversion tunnel line scheme for some hydropower station dam

在线阅读下载全文

作  者:韩闯[1] 陈宝海 史晓东[1] 于鹏新 HAN Chuang;CHEN Bao-hai;SHI Xiao-dong;YU Peng-xin

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]龙江县水利局,黑龙江龙江县161100

出  处:《东北水利水电》2019年第2期4-5,71,共3页Water Resources & Hydropower of Northeast China

摘  要:某水电站拱坝作为推荐坝型,在预可行性研究阶段已经通过审查,在可行性研究阶段仍需深入的进行混凝土拱坝、堆石坝等坝型比选工作,但目前尚未定论。因此文中以上坝址拱坝、堆石坝为代表坝型的枢纽布置为基础资料,进行导流洞洞线比选。The arch dam,is recommended as the dam type for some hydropower station,has been reviewed in pre-feasibility study stage.It is still necessary to carry out the dam type selection work in the feasibility study stage,such as concrete arch dam,the rockfill dam,and so on,but it has not yet been finalized.Therefore,the diversion tunnel lines are compared and selected based on the basic data of the junction layout for the representative dam types of arch dam and rockfill dam on the dam site.

关 键 词:大坝施工导流 洞线比选 水电站 

分 类 号:TV551.12[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象