检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩闯[1] 陈宝海 史晓东[1] 于鹏新 HAN Chuang;CHEN Bao-hai;SHI Xiao-dong;YU Peng-xin
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]龙江县水利局,黑龙江龙江县161100
出 处:《东北水利水电》2019年第2期4-5,71,共3页Water Resources & Hydropower of Northeast China
摘 要:某水电站拱坝作为推荐坝型,在预可行性研究阶段已经通过审查,在可行性研究阶段仍需深入的进行混凝土拱坝、堆石坝等坝型比选工作,但目前尚未定论。因此文中以上坝址拱坝、堆石坝为代表坝型的枢纽布置为基础资料,进行导流洞洞线比选。The arch dam,is recommended as the dam type for some hydropower station,has been reviewed in pre-feasibility study stage.It is still necessary to carry out the dam type selection work in the feasibility study stage,such as concrete arch dam,the rockfill dam,and so on,but it has not yet been finalized.Therefore,the diversion tunnel lines are compared and selected based on the basic data of the junction layout for the representative dam types of arch dam and rockfill dam on the dam site.
分 类 号:TV551.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.227.191