冻结法施工在哈尔滨地铁软弱地层中的应用  被引量:1

DESIGN OF FREEZING METHOD CONSTRUCTIONIN WEAK STRATUM OF HARBIN SUBWAY

在线阅读下载全文

作  者:李成军 LI Chengjun(Senior Engineering Harbin Institute of Geotechnical Investigation and Surveying, Harbin 150080, China)

机构地区:[1]哈尔滨市勘察测绘研究院,哈尔滨150010

出  处:《低温建筑技术》2019年第1期122-127,共6页Low Temperature Architecture Technology

摘  要:哈尔滨地铁1#线三期渤海路站-新疆大街站区间旁通道施工由于周边环境复杂、地层岩性变化大、岩性稳定性差、渗透性强、地下水含量丰富、补给充分,造成施工风险高,难度大。为解决地面加固和抽排地下水不便的问题,采用冻结法施工,该方法可以在冻结帷幕的保护下进行地下掘砌施工。Harbin subway line 1 phase 3 Bohai Road Station-Xinjiang Street Station intersection passage construction due to the influence of the surrounding complex environment, the lithology of the stratum varies greatly, the lithology stability is poor, the permeability is strong, the groundwater content is abundant, and the recharge is sufficient, the construction risk is high and difficult, High difficulty. In order to solve the problem of ground reinforcement and inconvenient drainage, the freezing method is used. This method can be used for underground excavation under the protection of freezing curtains.

关 键 词:冻结法 旁通道 冻结帷幕 

分 类 号:TU445[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象