检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩亮[1] 李红江[2] 刘殿书[3] 凌天龙[3] 李晨[3] 梁书锋[3] HAN Liang;LI Hongjiang;LIU Dianshu;LING Tianlong;LI Chen;LIANG Shufeng(College of Safety Engineering,North China Institute of Science and Technology,Beijing 101601,China;College of Geoscience and Surveying Engineering,China University of Mining and Technology(Beijing),Beijing 100083,China;School of Mechanics&Civil Engineering,China University of Mining and Technology(Beijing),Beijing 100083,China)
机构地区:[1]华北科技学院安全工程学院,北京101601 [2]中国矿业大学(北京)地球科学与测绘工程学院,北京100083 [3]中国矿业大学(北京)力学与建筑工程学院,北京100083
出 处:《振动与冲击》2019年第3期96-101,124,共7页Journal of Vibration and Shock
基 金:中央高校基本科研业务费(3142017092);河北省高等学校科学技术研究(ZC2016046;ZD2016204);国家自然科学基金青年基金(51804119);河北省高等学校科学技术研究青年基金(QN2018302)
摘 要:基于不同距离处测点的实测单孔波形,以1 ms等间隔双段叠加方法得到了叠加信号振速幅值随距离的变化情况,并确定了各测点最优微差时间。在考虑雷管延期误差的基础上,建立概率模型定量分析了延期误差对地震波干扰降振的影响。结果表明:近距离测点,低段位雷管的降振概率较大,远距离测点,高段位雷管的降振概率较大;此外,低段位雷管的降振概率受测点距离影响较大,高段位雷管所受影响较小。在实际爆破设计中,可根据不同测点处所允许的最大振速,对爆源处的雷管段别进行优化选取,为爆破设计提供有益的参考依据。Based on measured single-hole waveforms at points with different distances,vibration velocity amplitude variations of superposed signals with variation of distance were obtained by using the method of 1ms equal interval double-segment superposition,and the optimal delay time at each measured point was determined.Considering time-delay error of detonators,a probability model was established to quantitatively analyze influence of time-delay error of detonators on seismic wave interference vibration reduction.The results showed that at the measured point with near distance,low segment location detonator has a larger vibration reduction probability,while at the measured point with far distance,high segment location detonator has a larger vibration reduction probability;the distance of the measured point more largely affects the vibration reduction probability of low segment location detonator,but it affects that of high segment location detonator less;in the actual blasting design,the detonator segment number at the blast source can be chosen optimally according to the allowable maximum vibration velocity at different measured points to provide a useful reference for the blasting design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145