检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑一峰[1] 徐彬 赵群[1] 郑传峰[1] ZHENG Yifeng;XU Bin;ZHAO Qun;ZHENG Chuanfeng(College of Construction Engineering, Jilin University, Changchun 130026, China)
出 处:《路基工程》2019年第1期38-42,共5页Subgrade Engineering
基 金:国家自然科学基金项目(51508222)
摘 要:白城市红旗街上跨平齐线和白阿线公铁立交桥已运营三十余年,存在较严重的病害和安全隐患。通过桥梁检测和动静载试验,对该桥进行了技术状况和承载能力评定,结果表明:主梁刚度和跨中截面承载能力不满足设计要求。The overpass crossing Pingqi line and Baia line on Hongqi Street in Baicheng City has been in operation for more than 30 years. The bridge has relatively serious diseases and safety hazards. Through bridge detection and dynamic and static load tests, the bridge was evaluated for technical status and bearing capacity. The evaluation results showed that the stiffness of the main beam and the cross-middle section carrying capacity did not meet the design requirements.
分 类 号:U446.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145